Onlay preparation and cementation technique

199  175 

Half day long hand’s-on course by Dr. Marcin Krupinski
Date: 10 October (Saturday), from 09:30 to 13:30
The course provides 4 credit points.

20 in stock

 €
Categories: , Tag:

During the demonstration I’ll present step by step procedure of preparation of the tooth for indirect onlay restoration. Demonstration of tools and modern conservative approach. Field isolation for adhesive cementation - how to work with rubber dam in prosthodontics. Step by step cementation protocol for Indirect restoration.

- criteria for onlay preparation
- dentin conditioning and IDS
- temporary restoration
- onlay check, and rubber dam isolation technique
- preparation of tooth and restoration for adhesive procedure
- cementation, control of restoration and excess material
- occlusal check and final polishing

×